86exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


Anhui longmaker Technology Co., Ltd.

Products >> 5 gallons of bottled water, drinking water filling machine produ

5 gallons of bottled water, drinking water filling machine produ

Build Your Online Product Catalogs?



Description
Product Name: 5 gallons of bottled water, drinking water filling machine produ
Supply Ability: 40 sets
Related proudcts filling machine, beverage filling mac, pure water filling m,
Specifications QGF-300
Price Term: FOB,CIF
Port of loading: shanghai
Minimum Order 1 sets
Unit Price: 2000USD-20000USD

Product Description


Bottled production line is for 3 gallons, 5 gallons bottled drinking water production.The machine combines washing, filling and capping functions in an organic whole.It is an ideal equipment of mineral water, distilled water, pure water production.Whole stainless steel materials, corrosion resistance, easy to clean.The original main electric adopts SIEMENS, OMRON products, pneumatic system adopts famous brand product, the organization is co***ct, being a small workshop, high efficiency and stable and reliable, high degree of automation.Operator only needs two people, is a mechanical and electrical gas automatic equipment in the trinity.



bottled line according to its function can be divided into washing, filling and capping three steps, and its working process is as follows:

1. the empty barrel barrel tilted down into the mouth to send buckets, bucket chain movement clearance a location, at this point, the empty barrel barrel mouth barrel body wash for inverted form.

2. a total of four processing procedure: first as the water;The second is disinfectant;The third way for sterile water flushing;The fourth sterile water rinse again;After rinsing with 20 s time for bucket drain well.

3. rinse JingTong chain rotate 45 degrees, down to slip out of the bucket, and the top drum cylinder will flip bucket down 45 degrees put empty barrels in filling, waiting for filling.

4. filling valve driven by cylinder into the barrel mouth, filling automatic exhaust valve by open the filling, the filling time is set by PLC, and can be used according to the liquid level height panel multi-function button modification filling time, in order to achieve the best position, after filling to liquid level, excess water by automatic drain back to the pure water tank, in order to reduce water waste.

5. after filling, by filling a bucket cylinder will have barrels to gland location, for the next step when filling capping, thus the whole process is over.

Our co***ny has rich experience to help c

Contact Us
Company: Anhui longmaker Technology Co., Ltd.
Contact: Mr. cheng liu
Address: No.88 Lanzhou Road, Baohe District, Hefei
Postcode:
Tel: 8613917800215
Fax:
E-mail:         


Copyright© Anhui longmaker Technology Co., Ltd. All Rights Reserved.
Tel : 8613917800215 Fax :
Powered by 86exporter.com